Modernizing Dental Care: Inside Our Recent Dental Practice Remodel

Barton Oaks Dental Office Construction Feature

At S. Watts Group, we understand that dental offices are more than just workspaces—they’re where patient care begins. Since 2015, we have specialized in crafting healthcare environments that blend functionality, aesthetics, and efficiency with patient comfort. Our recent project with Barton Oaks Dental Group highlights our ability to meet the unique challenges of dental office construction while delivering results that support growth and patient satisfaction.

Spotlight Project: Barton Oaks Dental Group

Expanding and Modernizing a Growing Practice

The Barton Oaks Dental Group project involved remodeling their existing dental office and expanding into an adjacent 1,500-square-foot suite, resulting in a 5,100-square-foot facility. The primary goal was to seamlessly tie the two spaces together, creating a functional, modern, and patient-centered healthcare environment.

Delivering Precision Through Collaboration

Close Coordination with Equipment Providers:

We worked hand-in-hand with the office’s dental equipment provider to schedule equipment upgrade swaps, mechanical and electrical rough-ins, and the installation and startup of new equipment. This seamless integration was vital to ensure that all systems were operational and met the practice’s requirements.

Collaboration with Architects and Designers:

By maintaining an open line of communication with the architect and design team, we were able to customize millwork designs that optimized space for workflow, equipment accessibility, and usability. These tailored solutions were developed in partnership with the client to align with their vision and operational needs.

Proactive Communication with Clients and Subcontractors:

Weekly meetings with the site supervisor, subcontractors, design team, and client played a pivotal role in keeping the project on track. These sessions confirmed construction progress, addressed upcoming milestones, and planned for required access to occupied spaces or after-hours work.

Overcoming Challenges and Exceeding Expectations

One of the key challenges was maintaining a fully operational dental practice during the remodel—a necessity because people’s health can’t be tied down to a schedule, and patients need to continue receiving care when they need it. To address this, our team carefully planned after-hours work and collaborated closely with the client and subcontractors to minimize disruptions. Weekly meetings with all stakeholders—including the client, design team, and subcontractors—were instrumental in aligning timelines, coordinating access to occupied spaces, and ensuring a seamless transition between project phases.

Barton Oaks Dental Interior Equipment
Special attention was given to:
  • Equipment Integration: Coordinating with the dental equipment provider for upgrades, installations, and rough-in requirements.
  • Specialized Systems: Ensuring plumbing, medical gas, and drainage systems met precise specifications.
  • Workflow Optimization: Collaborating with the architect and design team to develop customized millwork that enhanced accessibility and usability.

A Partnership Built on Trust

This project exemplifies the value of teamwork and client collaboration. The result is a modern, efficient, and aesthetically pleasing dental office that not only meets but exceeds the client’s expectations.

S. Watts Group has done many projects with PGA Architects and working with Lindsay Works on the design and construction is always fulfilling. Getting to know the owners of Barton Oaks Dental, Brandon Parrish and Dr. Nemeth, and helping them achieve their vision of expanding their dental practice was a joy and I’m happy S. Watts Group was able to assist them in this endeavor.

Why Choose S. Watts Group for Dental Clinic Construction?

  • Experience: Over two decades of healthcare construction experience and an emphasis on building long-standing relationships.
  • Tailored Solutions: Spaces designed to reflect your practice’s unique needs, vision, and goals.
  • Strategic Planning: We lead with strategic solutions that save you time and money.
  • Collaboration & Open Communication: We want you to get to know the team with which you will be partnering. The team that will be delivering the good news, and the bad. Our word is our bond.

Experience in Dental Practice Construction Services

Whether you’re remodeling, expanding, or building from the ground up, S. Watts Group delivers tailored construction solutions for dental offices. From state-of-the-art operatories to welcoming waiting areas, we excel at creating modern, patient-centered spaces that meet the highest standards of healthcare functionality and compliance.

Designed for Wellness and Efficiency

Dental offices must do more than function—they should also create a positive and welcoming environment. Our approach integrates ergonomic layouts, advanced dental equipment needs, and aesthetics to foster trust and comfort. By focusing on both operational efficiency and patient experience, we help practices elevate their level of care.

At S. Watts Group, we’re not just building dental offices—we’re creating spaces that drive patient care and practice success. Contact us today to learn how we can support your dental practice construction needs.

Share:

Facebook
Twitter
LinkedIn